Vertical stab installed, rudder installed, cables attached, tensioned, wire locked, and all castle nuts from the tail to the undercarriage checked, tightened and split pins installed (man are there plenty of those!!) every bolt replaced with brand new from Placo ( holy bejeeeebers 6 small packets of nuts, bolts, and washers cost over R6K



The ailerons connected, adjusted, tensioned, co-ordinated controls adjusted, lined up, springs installed, and fully functional. So all flight controls are installed and tested 100% awesome!!
Nose wheel with undercarriage checked, angles and movement 100%
Stanchions filled with nitrogen, oil and tested 100%
All bolts, and connectors with cockpit controls installed and marked, yokes installed to test alignment, 100%
Planes incline set with inclinometer
Wing tips, tail tips, elevator tips installed
That's alot of work for a first time build - anyways not much to go still.
- canopy installation
- hydraulic pipe work
- test hydraulics
- install glass cockpit (still to purchase....)
- start engine and fly the hell out of it!!
5 points... How hard can that be??? Hahaha and then my beer was warm....